LEGAL ANALYSIS
Botón de compartir en Linkedin
Download pdf:
Procedures and documentation required to bid at the Spanish renewable capacity auction on 17 may 2017

Procedures and documentation required to bid at the Spanish renewable capacity auction on 17 may 2017

25/04/2017 - Author: Energy Area, Gómez-Acebo & Pombo

Procedures and documentation required to bid at the Spanish renewable capacity auction on 17 may 20171. Auction on 17 May 2017: introduction

The Spanish government has announced an auction for the allocation of subsidy payments under the name of specific remuneration scheme (régimen retributivo específico) for new Spanish mainland facilities that produce electricity from renewable energy sources.


A maximum of 2,000 MW of installed power entitled to the specific remuneration scheme will be allocated at this first auction on 17 May 2017 (hereinafter, the "Auction"). However, under specific circumstances, this maximum could be extended up to a threshold of 3,000 MW...

Download pdf:
Procedures and documentation required to bid at the Spanish renewable capacity auction on 17 may 2017